Automotive Airbag Auto Sensor Parts Precision Plastic Injection Molding Mould

- Mar 10, 2018 -


No.ItemDescription
1ModelM00007
2Mould BaseLONGJI
3Precision (mm)0.005
4Overall Size
(mm)
Length200
Width250
Height265
5Weight(KG)103
6Cavity materialNAK80
7Hardness
HRA
HRC38-42
8Mould Structure(Two plate, three plate, hot runner )Three plate
9Service Life300K
10Mould TypeSingle color mould
11Slide Qty0
12Lift Qty0
13Performance & ApplicationFor the airbag of automobile
14Production cycle20S



Machinery Equipment

 OriginBrandModelSets
CNCGermanDMGDMC 835V3
JapanLGMAZAK510IIL2
JapanFANUCa-D14MIA4
ChinaTIANYIV-8552
SwitzerlandMIKROMHSM 5001
ChinaJOINTNcm-10505
WEDMJapanSODICKAQ400Ls2
Pore EDM-HSKoreaKTCEZ4302
EDMJapanSODICKAD30Ls6
Surface GrinderChinaHONGZHUNHSG-618S2
Surface GrinderJapanMITSUIMITSUI4
Internal GrinderChinaZHENGJIA4ZJ010-N1
External GrinderChinaZHENGJIA4ZJ011-N2
Milling MachineChinaKUAIJIEWE68002
Milling MachineTAIWANFENGBAOXH-22
Injection Molding MachineJapanKAWAGUCHIKM228A3-S2
Measurement    
2D Measuring ProjectorJapanNIKONM4001
2D Measuring ProjectorJapanNIKONM8001
2D High-Precision AltimeterJapanMITUTOYOJL600E/EG1
Rockwell HardnessChinaTAIQINGHR-150A1
Height GuageJapanNIKONMF-5014
MicroscopeChina  5
Continuously Variable MicroscopeJapanOLYMPUS 1
3D Measuring ProjectorChina  1
Roundedss Measuring EquipmentJapanMITUTOYORA21001
Flatness InstrumentJapanMITUTOYOC-30001
ProfilometerJapanMITUTOYOC-30001
Roughness TesterJapanMITUTOYOS-30001




Our Advantage
1.Competitive price.
2.Continuance service and support.
3.Diversified rich experienced skilled workers.
4.Have two factories convenient for production.
5.Custom R&D program coordination.
6.Satisfaction,precision and trust.

Our Service
1.Customer send us the product drawing directly or we draw the product,
according to the sample,then we send customer the product drawing to confirm
2.We'll start to design mould after the product drawing confirmed,then
send customer the mould drawing to confirm
3.The mould start to make after the mould drawing confirmed,the process
 include preparing steel,rough cutting ,finishing machining,assembly etc
4.we'll test the mould after mould assembly,then we'll send customer samples
and video of mould test to confirm
5.The mould starts to polish if the sample is ok,and make grain,nitridation or
chroming if customer required
6.We'll test the mould again after polishing,then send customer the final
sample and video of mould test to confirm
7.The mould starts to pack with wooden case after the final sample confirmed,
then the mould will be sent to port and waiting for shipping
 
FAQ:

Q: Are you a factory or trading company? 
A: We are manufacture, we have two factories in Dongguan, One is in Hengli Town, the other is in Changping town

Q:How does your factory do regarding quality control? 
A: Quality is priority. We always attach great importance to quality controlling from the very beginning to the very end. All the moulds, the QC measure with corresponding measuring equipments regularly .

Q:What Certification will be guaranteed of your quality and services?
A: We obtained the ISO9001:2008 certification.

Q: Generally, how much do you export proportion in your product? Main country?
A: About 40-50%, main export country in Germany, Japan, Italy, Spain, USA etc.

Q: Which kind information need for quotation?
A: Sample photo with size or 2D/3D design.

Q: What is the delivery time?
A: 3~15 days for mould design, 15~25 days for mould production after deposit payment and mould design confirmed.

Q: How about the payment terms?
A: TT, L/C, Western Union, Paypal etc.

Q: Why choose us?
A: We have professional team with rich experiences and high precision equipments which can guarantee the product quality, through our scientific management and strict cost control we can offer you the best competitive price. 

 

Related Products