Auto Parts Mold Components

Auto Parts Mold Components

Auto parts mold components packaging details
1: Inner package with PP bag
2: Out package with box

Send Inquiry

Product Details

Auto parts mold components

Product name

Auto connector mold core insert,cavity insert,slide insert

Plastic material

PP, PPA, ABS, PE, PC, POM, HDPE, etc.

Steel of cavity and core

Depend on product, we help customer to choose the suitable material.

Commonly used material as below:

SCHMOLZ: P20HH, 2738, 2083H,2343, 2344, etc.

DIN: 1.2738,1.2083, 1.2343, 1.2344, 1.3343, etc.

AISI: P20, H13, D2, D6, M2, etc.

ASSAB: 718HH, Nimax, 8402, 8407, XW-10, XW-5, EM2, etc.

Japanese: HPM2, NAK80, SKD61, SKS3, SKD11, DC53, SKH51, etc.

Steel of mold base

Depend on product, we help customer to choose the suitable material.

Commonly use S45C.

Mould Standard components

HASCO, MISUMI, Meusburger, DME, etc.

Runner

1.Hot Runner: (Synventive from Netherland) or as your requests.

2.Cold Runner.

Mold life

Depends on the steel material and your requests.

Commonly used:

1. 300,000-500,000 shots for 1 year under normal use prodcedure for pre-hardness steel material.

2. 5.00,000 shots for 1 year under normal use prodcedure for heat treatment steel material.

Surface finish

Depends on your requirements.

Commonly: Texture Hatching, EDM Hatching, Polishing, Diamoud Polishing, Mirror Polishing and so on.

Delivery time

Depends on the size and structure.

Normally: 25-30 working days after 50% down payment.

Terms of payment

T/T, L/C, Western Union, D/A, D/P, Paypal.

Machine center

High speed CNC, Wire cutting, EDM, Grinder, Great Grinder, CNC milling, Drilling and milling, Stamping punching machines, injection machine, Inspection.

R&D

1. Drawing design and making for products and mold;

2. Mold drawing revising;

3. Production time and quality control in each machining process. (Our own EPR system).

Production

Pilot Run production and molding production can be provided.

Auto parts mold components packaging details

1: Inner package with PP bag
2: Out package with box
3: Base on customer's requiry

Auto Part Mold Components Delivery Time

7days after order confirmed

图片4.jpg

Hymolding located in Dongguan city, has modern plants with the scale of 3000 square meters.
With our professional design, advanced machines, precise skills and advanced management experience, we are continuously providing high quality tooling and service to our customers. Especially in automotive industry, special injection mold such as 2k mold, stack mold, tandem mold.
We control our overhead cost, enhance supplier management, improve production efficiency, therefore, in the fierce market competition, we are continuously offering very competitive price to our customers.

ͼƬ11.jpg

FAQ

Q: Are you trading company or manufacturer ?

A: We are factory.

Q: How long is your delivery time?

A: Generally it is 5-10 days , it is according to quantity.

Q: what kind of payment condition do you accept?

A: For small order 100% payment before production. Payment >5000USD, 50% T/T of deposit before production, and balance before shipping.

Q: How to know whether my product is being start on schedule?

A: We will send details schedule and weekly report.

Hot Tags: auto parts mold components, China, manufacturer, supplier, companies, maker, making, process, manufacturing, service

Previous:Auto Parts Mould Parts Next:Plastic Die Parts Casting

Related Products

Inquiry